Continuous Ligotization

Continuous Ligotization

Continuous Ligotization

For Sinobras, a steel mill in Marabá-PA, Drawind developed the conceptual, basic and detailed designs for the expansion of the mill's continuous casting process, including the complete replacement of the process equipment purchased from SMS.


The project encompassed all engineering disciplines, focusing on the installation of new equipment and the peripherals necessary to ensure the system's perfect operation. With over 20,000 engineering hours, this work once again reinforces Drawind's commitment to the steel industry and its capabilities in large-scale projects.

Continuous Ligotization

For Sinobras, a steel mill in Marabá-PA, Drawind developed the conceptual, basic and detailed designs for the expansion of the mill's continuous casting process, including the complete replacement of the process equipment purchased from SMS.


The project encompassed all engineering disciplines, focusing on the installation of new equipment and the peripherals necessary to ensure the system's perfect operation. With over 20,000 engineering hours, this work once again reinforces Drawind's commitment to the steel industry and its capabilities in large-scale projects.

Continuous Ligotization

For Sinobras, a steel mill in Marabá-PA, Drawind developed the conceptual, basic and detailed designs for the expansion of the mill's continuous casting process, including the complete replacement of the process equipment purchased from SMS.


The project encompassed all engineering disciplines, focusing on the installation of new equipment and the peripherals necessary to ensure the system's perfect operation. With over 20,000 engineering hours, this work once again reinforces Drawind's commitment to the steel industry and its capabilities in large-scale projects.

Destaques Técnicos:

Redução de interferências com tecnologia BIM

Otimização do tempo de

montagem em 60%

Maior eficiência operacional

Capacidade da planta: 90 toneladas/hora projetadas, 136 toneladas/hora registradas

Equipamentos utilizados: 4 filtros ANDRITZ com 180 placas 2x2

Redução de custos operacionais com melhoria da eficiência energética

Over 22 years of excellence in multidisciplinary engineering. Complete, integrated, high-performance solutions for industrial projects.

Pages

About Us

Projects

Contact

Work with us

Contact

proposta@drawind.com.br

(31) 3222-0901

Timbiras Street, 2237 2°, 3°, 4° e 6° floor, Lourdes, Belo Horizonte - MG, 30140-069



© 2025 All Rights Reserved

Over 22 years of excellence in multidisciplinary engineering. Complete, integrated, high-performance solutions for industrial projects.

Pages

About Us

Projects

Contact

Work with us

Contact

proposta@drawind.com.br

(31) 3222-0901

Rua dos Timbiras, 2237 2°, 3°, 4° e 6° andar, Bairro Lourdes, Belo Horizonte - MG, 30140-069



© 2025 All Rights Reserved