Tailings Filtration Plant

Tailings Filtration Plant

Tailings Filtration Plant.

Tailings Filtration Plant

DRAWIND worked on the entire ITAMINAS plant expansion project, with a particular focus on the tailings filtration plant. In this project, DRAWIND worked from the definition of the mineral process, through basic and detailed conceptual engineering, and finally to the manufacturing detail level. Working across all disciplines using BIM technology, the Itaminas tailings filtration project received the Minério e Minerales Magazine award for its operational efficiency. The ceremony took place in June 2022 at the Dom Cabral Foundation.


Tailings Filtration Plant

DRAWIND worked on the entire ITAMINAS plant expansion project, with a particular focus on the tailings filtration plant. In this project, DRAWIND worked from the definition of the mineral process, through basic and detailed conceptual engineering, and finally to the manufacturing detail level. Working across all disciplines using BIM technology, the Itaminas tailings filtration project received the Minério e Minerales Magazine award for its operational efficiency. The ceremony took place in June 2022 at the Dom Cabral Foundation.


Tailings Filtration Plant

DRAWIND worked on the entire ITAMINAS plant expansion project, with a particular focus on the tailings filtration plant. In this project, DRAWIND worked from the definition of the mineral process, through basic and detailed conceptual engineering, and finally to the manufacturing detail level. Working across all disciplines using BIM technology, the Itaminas tailings filtration project received the Minério e Minerales Magazine award for its operational efficiency. The ceremony took place in June 2022 at the Dom Cabral Foundation.


Máxima
Performance

A planta de filtragem opera com capacidade superior a idealizada, sem que seja danoso à estrutura e ao equipamento. Isso se dá pela alta tecnologia e comprometimento durante a fase de projeto, totalmente executado pela equipe DRAWIND.

04

Filtros ANDRITZ

180

Placas 2x2

90TON/H

Capacidade do Projeto

136TON/H

Capacidade Registrada

Maximum

Performance

The filtration plant operates at a higher capacity than expected without damaging the structure or equipment. This is due to advanced technology and commitment during the design phase, entirely executed by the DRAWIND team.

04

ANDRITZ Filters

180

2x2 Plates

90TON/H

Project Capacity

136TON/H

Registered
Capacity

Maximum

Performance

The filtration plant operates at a higher capacity than expected without damaging the structure or equipment. This is due to advanced technology and commitment during the design phase, entirely executed by the DRAWIND team.

04

ANDRITZ Filters

180

2x2 Plates

90TON/H

Project Capacity

136TON/H

Registered
Capacity

Over 22 years of excellence in multidisciplinary engineering. Complete, integrated, high-performance solutions for industrial projects.

Pages

About Us

Projects

Contact

Work with us

Contact

proposta@drawind.com.br

(31) 3222-0901

Timbiras Street, 2237 2°, 3°, 4° e 6° floor, Lourdes, Belo Horizonte - MG, 30140-069



© 2025 All Rights Reserved

Over 22 years of excellence in multidisciplinary engineering. Complete, integrated, high-performance solutions for industrial projects.

Pages

About Us

Projects

Contact

Work with us

Contact

proposta@drawind.com.br

(31) 3222-0901

Timbiras Street, 2237 2°, 3°, 4° e 6° floor, Lourdes, Belo Horizonte - MG, 30140-069



© 2025 All Rights Reserved

Over 22 years of excellence in multidisciplinary engineering. Complete, integrated, high-performance solutions for industrial projects.

Pages

About Us

Projects

Contact

Work with us

Contact

proposta@drawind.com.br

(31) 3222-0901

Rua dos Timbiras, 2237 2°, 3°, 4° e 6° andar, Bairro Lourdes, Belo Horizonte - MG, 30140-069



© 2025 All Rights Reserved