
New Lamination
Edger Mill and Steckel
Case de Sucesso

Ouro Branco Plant.
New Lamination
Edger Mill and Steckel
Drawind worked on the multidisciplinary basic and detailed design for the installation of two new rolling mills at the Ouro Branco plant in Minas Gerais. This project gained national visibility, being one of the largest steel projects of 2023.
Working across all disciplines, from point cloud generation to integration with the existing project, Drawind developed the project following the most advanced BIM/AWP methodology.
New Lamination
Edger Mill and Steckel
Drawind worked on the multidisciplinary basic and detailed design for the installation of two new rolling mills at the Ouro Branco plant in Minas Gerais. This project gained national visibility, being one of the largest steel projects of 2023.
Working across all disciplines, from point cloud generation to integration with the existing project, Drawind developed the project following the most advanced BIM/AWP methodology.
New Lamination
Edger Mill and Steckel
Drawind worked on the multidisciplinary basic and detailed design for the installation of two new rolling mills at the Ouro Branco plant in Minas Gerais. This project gained national visibility, being one of the largest steel projects of 2023.
Working across all disciplines, from point cloud generation to integration with the existing project, Drawind developed the project following the most advanced BIM/AWP methodology.