


Rejeitoduto – By-Pass de Filtragem
Reject Pipeline – Filtration By-Pass

Reject Pipeline (Filtration Bypass)
Rejeitoduto (By-Pass de Filtragem)
Reject Pipeline – Filtration By-Pass
For ArcelorMittal Mina de Serra Azul, Drawind developed the conceptual, basic, and detailed designs for the installation of a new safety bypass system for tailings filtration. The scope included the installation of new tailings tanks, pump houses, and the tailings pipeline, ensuring greater safety and efficiency in the process. The system's implementation enabled operational continuity with reduced environmental impact and greater control over the
the treatment of waste.

Reject Pipeline – Filtration By-Pass
For ArcelorMittal Mina de Serra Azul, Drawind developed the conceptual, basic, and detailed designs for the installation of a new safety bypass system for tailings filtration. The scope included the installation of new tailings tanks, pump houses, and the tailings pipeline, ensuring greater safety and efficiency in the process. The system's implementation enabled operational continuity with reduced environmental impact and greater control over the
the treatment of waste.

Reject Pipeline – Filtration By-Pass
For ArcelorMittal Mina de Serra Azul, Drawind developed the conceptual, basic, and detailed designs for the installation of a new safety bypass system for tailings filtration. The scope included the installation of new tailings tanks, pump houses, and the tailings pipeline, ensuring greater safety and efficiency in the process. The system's implementation enabled operational continuity with reduced environmental impact and greater control over the
the treatment of waste.

Technical Highlights:
Slurry pumping engineering
Installation of new tanks and pump houses
Improved operational safety
Optimization of waste management with lower environmental impact